Just another fucking reason I hate this place...............NM that is.
The weak stick fucking developers that built my house set up my power supply with bitch ass cable. So now I get to go get a permit with the city, dig a fucking trench 60 fucking feet across my front yard and have someone come out and bore under my driveway dig another 30 feet to my meter so I can run 00 power cable to the meter. Then I get to have an electrician come and run the meter to a breaker/splitter that sends 100 amps to the existing panel (what it runs now) and another 100 amps to another panel so I can power up my garage toys (compressor, welders, plasma cutter and all my other shit) to start my builds. So now I get to work more overtime to pay the bills and I guess puts some of my other purchases on the back burner. I know...........boo fucking hoo........... makes me bored anyways
__________________
There will be NO GENTLEMEN at my table or at any table I sit! I am the rooster of MCDB's hen house. D's chicks be mine!
|
||||||||
|
|
|
|
|
#3 (permalink) | ||||||||
|
Pro Racer
Join Date: Jun 2009
Location: Big Bend of Florida
Motorcycles': F4i CB 750A assorted dirt bikes
Posts: 1,430
Rep Power: 4 Casino cash: $19045 ![]() |
You didn't ask those questions before you bought the house? I'll bet you do the next time
__________________
A government does not have to burn or ban books when they can digitize and delete them We now have official confirmation Osama Bin Laden and Muammar Qaddafi are dead. Yesterday they registered to vote in Chicago |
||||||||
|
|
|
|
|
#5 (permalink) | ||||||||
|
RESIDENT ASSHOLE
Join Date: Jun 2009
Location: at your moms house
Motorcycles': many.....too many
Posts: 1,438
Rep Power: 4 Casino cash: $22453 ![]() |
No I just looked at the panel and figured I could use the 4 breakers available after converting my dryer to gas to (2) 220 plugs. Then I started thinking..............
TIG welder.........runs better on 220 Mig welder.........runs better on 220 Plasma cutter.....only runs on 220 Air compressor....only runs on 220 Then add in my 20 amp Kiln that runs on 110 so it needs a dedicated circuit when in use.......... Some extra here and there to run lights and fans and various power tools.... NEED 100 AMPS EXTRA just for the 220 shit. The 4 breakers I have will give me my power for more lights and plugs for tools and a dedicated circuit for the kiln. They run mini transformers that luckily one sits in my front yard at the property line. Supposedly 6 houses per transformer. I have to have the power company make sure that it can supply the juice first (should be able to since no one has refridge air in the neighborhood yet) and if they pull up that its available I get to have them come out AFTER THE PERMIT and mark where I get to trench the yard 36" deep to the drive way and then from the other side to the meter spot. Have the guy with the bore tool come knock a tunnel out under the driveway and lay the conduit. They come run the line.................... Then have the electrictian come splice of the meter and run dual boxes. Man.................I should have just built a loft in a commercial building.
__________________
There will be NO GENTLEMEN at my table or at any table I sit! I am the rooster of MCDB's hen house. D's chicks be mine!
|
||||||||
|
|
|
|
|
#6 (permalink) | ||||||||
|
Semi-pro rider
Join Date: Jun 2009
Location: The Great North Wet
Motorcycles': Mad Max the 610, squidly 675, track fodder SV, parts queen Norton
Posts: 733
Rep Power: 3 Casino cash: $25064 ![]() |
How many people run what amounts to an industrial welding shop in their garage? Nobody builds houses for people with the kinds of equipment you use. How many people even know what 220 is? They don't even think about the funny plug on an electric dryer or stove.
__________________
Go soothingly on the grease mud as there lurks the skid demon. |
||||||||
|
|
|
|
|
#7 (permalink) | ||||||||
|
Weekend Warrior
Join Date: Jun 2009
Location: Winchester Ky.
Motorcycles': 09 ducati696
Posts: 111
Rep Power: 3 Casino cash: $2470 ![]() |
Hybrid I have run gas lines under driveways without a boring tool.
The way I do it is I take a joint of black pipe (21ft) say 3/4 inch, put a bell reducer 3/4 to 3/8 a short 3/8 nipple. That will be the end that goes under the drive. On the other end I put a 3/4 cap. Then get someone to hold the pipe straight and hit the capped end with a sledge hammer. Unless there is an awful lot of rock, you can drive it all the way through. Then take off the cap and bell reducer from the ends and slide the wire through. Works for me, but I don't mean to get into your business.
__________________
Old and sick, the chicks dig it!! |
||||||||
|
|
|
|
|
#8 (permalink) | ||||||||
|
------------------------
Join Date: Jun 2009
Location: ------------------------
Motorcycles': ------------------------
Posts: 2,437
Rep Power: 5 Casino cash: $38336 ![]() |
My old house originally had the power come into the garage through a fuse box that had 2 of the glass screw in fuses. It was later changed to a breaker box on the outside of the house behind the kitchen but with inly 4 breakers for the whole house so when I wanted to add lights and outlets to the garage I had to cut the existing power to the garage from the house and wire in a new box just to keep from throwing the breaker that covered half the house. That is the only way I can have a small compressor in the garage as well as a small 220 welder. Need to rewire the house along with re-plumb, add new windows and doors, add insulation, redo the bath and kitchen, pull siding off to repair any water damage from water getting in behind the aluminum siding that the po put on. Oh well we will get there one of these days.
|
||||||||
|
|
|
|
|
#10 (permalink) | ||||||||
|
RESIDENT ASSHOLE
Join Date: Jun 2009
Location: at your moms house
Motorcycles': many.....too many
Posts: 1,438
Rep Power: 4 Casino cash: $22453 ![]() |
I have 2 electricians. One I gave a helmet to so he owes me the other wants to trade me paint work for power work.
The cost of having it done with me buying the parts? Probably about 3-400 bucks. If the cable to the meter can hold more than the juice youre getting its as simple as taking it from the meter, splitting it in a dual hundred splitter and running that to your existing box and to the new box. I mean in all reality, a 200 amp service is relatively mild. Even the 100 amp panel i add wont get a full hundo drawn on it at one time. I cant mig, tig, plasma cut while the compressor is running. I just hate having to fucking plug in and unplug and plug in and unplug to get shit done. I just want to walk to the area the tool is and start working. I found a 100 amp panel for 80 bucks new, the breakers are about 20 each for 20 amp 220 breakers The splitter is 50 and the cable is about 20 So say you pay for it from your meter to the box.............500 max. That aint shit really. But tis 500 I cant use to import some cool shit for my next project and 500 I cant dump into the streetfighter project I want to get moving on.
__________________
There will be NO GENTLEMEN at my table or at any table I sit! I am the rooster of MCDB's hen house. D's chicks be mine!
|
||||||||
|
|
|
![]() |
| Tags |
| knew |
| Currently Active Users Viewing This Thread: 1 (0 members and 1 guests) | |
| Thread Tools | Search this Thread |
| Display Modes | |
|
|